Rear Extensions in London: Cost, Planning and Design

· 7 min read

Rear Extensions in London: Cost, Planning and Design, a London renovation guide by MVV

A rear extension builds out from the back wall of the house into the garden. On a London terrace or semi it is the usual way to turn a separate kitchen and dining room into one open room for cooking, eating and living, with the garden on the other side of the glass.

This guide covers the three things that decide a rear extension, as of October 2026: what it costs, what planning allows, and the design choices that make the room worth having. For the choice between a rear extension and a side return, see our rear extension or side return guide.

Our serviceFrom The MVV, a family business of builders in Chiswick. This guide is part of our work on house extensions in London.

The kinds of rear extension

  • Single storey: the most common. It adds depth to the ground floor, usually for an open plan kitchen, dining and living room, and it is the one most often built under permitted development: see our single storey extension cost guide. On a house with a flat back wall it usually runs the full width of the house.
  • Two storey: a room on each floor in one build, such as a larger kitchen below and a bedroom and shower room above. Its permitted development limits are tighter, and in London it often needs a planning application.
  • Wrap around: a rear extension combined with a side return infill in an L, for a room across the full width of the house. It is the most transformative and usually needs a planning application: see our wraparound extension ideas.

How much does a rear extension cost in London?

From typical London jobs priced on our estimator in October 2026, all ex VAT and indicative rather than a quotation:

  • A single storey rear extension of about 20 m² of new floor, flat roofed with no rooflights, plus making good the room it joins: around £57,000, roughly £2,900 per square metre of new floor.
  • New above ground space at a standard specification: £2,650 to £2,900 per square metre of new floor.
  • A two storey side return adding a kitchen extension with a bedroom and shower room above, about 48 m² of new floor: around £128,000.

Our minimum for a complete extension project, once finishes and fittings are included, is around £85,000. The figures price windows, doors, any rooflights, sanitaryware and tiles for fitting only, with the products supplied by you, and leave out kitchen units, worktops and appliances. The full breakdown is in our house extension cost guide, with kitchens in our kitchen extension cost guide and two storey work in our two storey extension cost guide, and the extension cost calculator prices your own in about two minutes.

A rear extension with a full refurbishment

Many London rear extensions are built together with a refurbishment of the rest of the house, so that the steel, the drains, the heating and the wiring are dealt with once, while the house is already open. From typical London jobs priced on our estimator in October 2026, all ex VAT and indicative rather than a quotation:

  • A whole house refurbishment that includes a new extension: £1,100 to £1,350 per square metre of all the floor worked on, at a standard specification.
  • A 20 m² extension plus a full refurbishment of a 130 m² house, around 150 m² overall: £165,000 to £195,000 for the two together.

These figures cover the building work. Kitchen units, worktops and appliances are not included, and windows, doors, sanitaryware, tiles and wood flooring are priced for fitting only. Doing both as one project means one team, one programme and one period of disruption rather than two. Our house refurbishment cost guide has the full breakdown, and our property refurbishments page shows how we run them.

What permitted development allows

A single storey rear extension to a house can often be built without a planning application, within these limits in England as of October 2026:

  • Up to 3 metres beyond the original rear wall of a terraced or semi detached house, or 4 metres for a detached house.
  • Up to 6 metres, or 8 metres for a detached house, through the prior approval route, in which the council consults the neighbours before deciding.
  • No more than 4 metres high, and within 2 metres of a boundary the eaves may be no higher than 3 metres.
  • Together with other additions, it may not cover more than half the land around the original house, and the materials should look similar to the existing house.

The prior approval route is not available in conservation areas, flats and maisonettes have no permitted development rights, and a listed building needs listed building consent. Where you rely on permitted development, a Lawful Development Certificate from the council confirms it in writing. Our guide to permitted development for extensions explains each rule, and our step by step guide to planning a house extension covers the full sequence.

Party walls, drains and the neighbours

Most London rear extensions involve the Party Wall etc. Act 1996:

  • New foundations within 3 metres of the neighbour's building, and deeper than its foundations, need one month's excavation notice.
  • A new wall at the line of junction with the neighbour needs one month's notice.
  • Work to an existing party wall, such as cutting in a beam, needs two months' notice.

Drains are the other hidden constraint. Building over or close to a public sewer needs the water company's agreement, so we survey the drains before the design is fixed rather than after.

The design choices that make the room

  • Light: a deep rear extension can leave the middle of the house darker. Rooflights or a glazed roof near the old back wall bring daylight to the centre of the plan.
  • The opening: joining the extension to the house means taking out part of the back wall on new steel beams, which is what makes the room feel like one space rather than two.
  • The garden side: wide glazed doors connect the room to the garden, and a level threshold makes the two feel continuous.
  • The roof: a flat roof keeps the height down near the neighbours, while a pitched or partly glazed roof gives more volume where planning allows.

How long a rear extension takes

A single storey rear extension typically takes around three to four months on site once planning is in place and the design is agreed. Before that, allow time for the design, the party wall notices and, where one is needed, the planning application: the council's target for a householder decision is eight weeks. A two storey extension, or a rear extension built together with a full refurbishment, takes longer, and we set out the programme stage by stage before work starts.

Rear extensions we have built

At St Germans Place in Blackheath, SE3, we designed and built a rear extension that created additional space for the kitchen, with Velux skylights and traditional style wooden doors opening onto a new patio: see the St Germans Place project.

At Milford Mews in Streatham, SW16, a double storey side extension created an open plan living room lit from two aspects, with a principal bedroom suite above, finished outside in brick and timber cladding: see the Milford Mews project.

Rear extensions across London

We design and build rear extensions across West, South West, North West, Central and South East London, from our office in Chiswick, W4. Each part of London has its own housing and its own planning character, and our area pages set out what that means locally:

Much of inner London is conservation area. There the back of a house is usually treated more flexibly than the street front, but the details still matter, so we check the address before the design starts.

Where to start

Start with the house, not the drawing: a survey of the structure, the drains and the planning position shows what is possible before anyone commits. We then sketch the options side by side, so the trade offs between depth, light and cost are visible. For a first budget, the extension cost calculator gives an indicative London range in about two minutes. Our house extensions and kitchen extensions pages show how we design and build them.

Good to know

Frequently asked questions

How much does a rear extension cost in London?
A single storey rear extension of about 20 m² of new floor, flat roofed, plus making good the room it joins, came to around £57,000 ex VAT on typical London jobs priced on our estimator in October 2026. New space at a standard specification runs about £2,650 to £2,900 per square metre of new floor, and our minimum for a complete extension project is around £85,000.
How much does a rear extension and full refurbishment cost?
From typical London jobs priced on our estimator in October 2026, a 20 m² extension plus a full refurbishment of a 130 m² house, around 150 m² overall, came to £165,000 to £195,000 ex VAT for the two together, indicative. A whole house refurbishment that includes a new extension runs about £1,100 to £1,350 per square metre of all the floor worked on, at a standard specification.
How long does a rear extension take to build?
A single storey rear extension typically takes around three to four months on site once planning is in place and the design is agreed. Allow time before that for the design, the party wall notices and, where one is needed, the planning application: the council's target for a householder decision is eight weeks.
Do I need planning permission for a rear extension?
Not always. A single storey rear extension to a house can be permitted development up to 3 metres deep for a terraced or semi detached house, or 4 metres for a detached house, and no more than 4 metres high. Larger ones need prior approval or a planning application, and flats have no permitted development rights.
How far can I extend at the back without planning permission?
Up to 3 metres beyond the original rear wall of a terraced or semi detached house, or 4 metres for a detached house, and up to 6 or 8 metres through the prior approval route, in which the council consults the neighbours. The prior approval route is not available in conservation areas.
Do I need a party wall agreement for a rear extension?
Usually. New foundations within 3 metres of the neighbour's building and deeper than its foundations need one month's excavation notice, a new wall at the line of junction needs one month's notice, and work to an existing party wall needs two months.
Can I build a rear extension in a conservation area?
Often, yes. A single storey rear extension within the standard permitted development limits can still be built in a conservation area, but the larger prior approval route is not available, and some councils remove permitted development rights with an Article 4 direction. We check the address before the design starts.
Which parts of London do you build rear extensions in?
West, South West, North West, Central and South East London, from our office in Chiswick, W4. Our rear and double storey extensions include St Germans Place in Blackheath, SE3, and Milford Mews in Streatham, SW16.