Belsize Park, NW3
Refurbishment

Eton Lane, Residential Refurbishment

Project at a glance

Location

Belsize Park

Project type

Refurbishment

Duration

3 Months

Project scope

MVV has been appointed to refurbish this two-bedroom, two-bathroom flat, delivering a modern and functional transformation. The scope of work included the installation of new bathrooms, upgraded electrical and plumbing systems, new flooring throughout, and a fully redesigned kitchen. The project was completed with carefully selected decoration to enhance the overall aesthetic and comfort of the space.

From concept to
completion

Stage One:

Interior Design & Finishes Package

Developing the interior design concept and detailing the finishes, materials, and color schemes for the project.

Stage Two:

Strip-Out & Demolition

Clearing the space by removing existing structures and elements in preparation for the renovation.

Stage Three:

Structural Enforcement

Reinforcing the building’s structure to ensure stability and support for the new design elements.

Stage Four:

Construction & Decoration

Building out the new layout, including all construction works, followed by painting, plastering, and decorative touches to finalize the space.

Stage Five:

Finishing & Furnishings

Installation of final touches, including furniture, lighting, and accessories, bringing the design to life and completing the transformation.

Pro tips from our experts

Focus on high-impact, cost-effective upgrades like decoration, upgraded lighting, and statement fixtures. Simple changes like replacing hardware, adding trim or molding, and investing in quality textiles can make a space look luxurious.

Mathew, Project Architect

From concept to completion

Stage One:

Interior Design & Finishes Package

Developing the interior design concept and detailing the finishes, materials, and color schemes for the project.

Stage Two:

Strip-Out & Demolition

Clearing the space by removing existing structures and elements in preparation for the renovation.

Stage Three:

Structural Enforcement

Reinforcing the building’s structure to ensure stability and support for the new design elements.

Stage Four:

Construction & Decoration

Building out the new layout, including all construction works, followed by painting, plastering, and decorative touches to finalize the space.

Stage Five:

Finishing & Furnishings

Installation of final touches, including furniture, lighting, and accessories, bringing the design to life and completing the transformation.

Pro tips from our experts

Focus on high-impact, cost-effective upgrades like decoration, upgraded lighting, and statement fixtures. Simple changes like replacing hardware, adding trim or molding, and investing in quality textiles can make a space look luxurious.

Mathew, Project Architect

1

Stage One:
Interior Design & Finishes Package

2

Stage Two:
Strip-Out & Demolition

3

Stage Three:
Structural Enforcemen

4

Stage Four:
Construction & Decoration

5

Stage Five:
Finishing & Furnishings

Visual gallery

Client’s Words

“Effortless collaboration”

MVV did a great job. Trustworthy, they met our deadlines and kept cost in check. I would definitely use them again.
Refurbishment

Project highlights

Quick Turnaround

With a swift turnaround of just 3 months, the project involved upgrading key elements such as electrical systems, plumbing, kitchen, and flooring, ensuring a high-quality finish in a short time frame.

Building Heritage

The project carefully preserved the building’s heritage style while modernizing essential features, blending classic charm with contemporary functionality.

Craftsmanship & Transformation

This project is a testament to thoughtful transformation—where skilled craftsmanship meets intentional design. Existing features were sensitively restored and seamlessly integrated with modern interventions, resulting in a space that feels both renewed and rooted in its original character.